"Free Dave" Day 6: The Reveal of Dave-Time Saved
Author
Theresa Clark
Published

🎣 Dave is fishing this morning. His phone is off. Nobody minds.
A few weeks ago I wrote that every nuclear plant has a Dave. A lot of you said "I'm Dave." And then you told me what that actually means.
You're the only one who knows why the EDG load sequencing is the way it is.
You get called at 11pm during a transient because you're the only one trusted to know the right answer.
You haven't taken a real vacation in years because you're afraid of what happens if you're unreachable.
Daves are everywhere. And you deserve better.
We added up 513 𝐡𝐨𝐮𝐫𝐬 𝐟𝐫𝐞𝐞𝐝 in our scenarios over the last two weeks.
But the number isn't what matters.
Dave mentored a junior engineer who can now find the answer herself. He made a $200K scoping call on data instead of gut feel. He caught a vendor parts trend before it became a failure. He saved the outage schedule. He documented his reasoning so the next engineer doesn't start from scratch.
Dave didn't get replaced. Dave got to be the engineer he was hired to be.
The tool is Gordian. One platform. Your engineers review and sign every output. The judgment stays human. The archaeology becomes instant. The knowledge stays when people leave.
⛓️💥 If you’re ready to #freedave at your organization, reach out to theresa@everstar.ai.
🎬 If you want a “season 2” of Dave’s antics, let me know that too, because this was really fun.

Related Posts

Your Plant Already Has a Knowledge Graph. It's a Guy Named Dave.
Knowledge graphs make engineering visible. And in a capital-intensive, schedule-sensitive regulated industry, that is worth a LOT.

"Free Dave" Day 1: Surveillance Traceability
Dave answers Lena's surveillance-frequency question faster than ever and gets home in time to grill. #freedave

"Free Dave" Day 2: 10 CFR 50.59 Evaluations
Dave made the call after Gordian did all of the annoying parts of the evaluation. He got home and is enjoying a fire in the backyard.

"Free Dave" Day 3: Prepping for the EPU
Dave did some quick calculations right inside Gordian and probably saved the company $200K. He treated himself to an evening ride on the lake.

"Free Dave" Day 4: Plant Health Committee
Dave has been the memory of the plant health committee for years. Now he's letting Gordian handle that, and he has spare time to finally fix the dock.

"Free Dave" Day 5: Dave Saves the Outage
Dave saves the day with Gordian when the vendor manual comes in way late. The he saves the day at home by striping his lawn properly.