TITAN
Forging America's next epoch
Autonomous heavy industry at sovereign scale.
The best nuclear is already here.
Large pre-licensed reactors are power-dense, shovel-ready, and offer the best economics.
Beating fossil on price is an execution problem.
North Star
Half the price of gas.
At $5B per GW and a 5-year build, nuclear undercuts gas on levelized cost.
Cost per gigawatt
$18B
Previous US builds
$5B
Titan target
Construction cycle
14 yrs
Recent US record
5 yrs
Titan target
A lost craft
Welding almost broke the industry
Bad welds, rework, and cascading delays plagued Plant Vogtle.
China solved module fabrication, and now builds reactors in 5 years.

America's Pyramids
America cannot build its own reactors.
Critical nuclear components bottlenecked on foreign suppliers.
Still no production line for the structural modules that broke the last nuclear builds.
We're building a sovereign manufacturing capacity to enable the 400 GW deployment plan.
The Nervous System
Autonomy transforming welding
Gordian Anvil orchestrates swarm manufacturing, supply chain provenance, workforce training, and large-scale project management.
Every weld provably perfect, the first time.

Structural module fabrication & autonomous welding
Atlas
Exascale production line for structural and equipment modules. Every weld AI-controlled, 100% inspected, NQA-1 certified - solving Vogtle's root cause failure at scale.

Heavy components forge
Vulcan
Reactor pressure vessels. Steam generators. Primary coolant piping. The world's most advanced factory building the heart of every reactor.
Warp Speed Production
Now
Engineering, consortium construction, site selection
Next
First production before 2030
Then
Full-rate domestic and export production. 20 sets per year.
Dual use
Reactors, Ships, Power
Titan is a forge for civilian reactors, commercial ships, and naval power.

American nuclear at scale.
The sovereign nuclear industrial base to power 400 GW by 2050.