"Free Dave" Day 2: 10 CFR 50.59 Evaluations
Author
Theresa Clark
Published

๐ย We can #freedave with the tool that knows when to dig deepโฆ and when to stop.
A proposed MOV actuator replacement needs a 50.59.
๐๐๐ฏ๐'๐ฌ ๐จ๐ฅ๐ ๐ฐ๐๐ฒ: FSAR archaeology, criteria walkthrough, documentation, and reviewer back-and-forth. 11 ๐ก๐จ๐ฎ๐ซ๐ฌ.
๐๐ข๐ญ๐ก ๐๐จ๐ซ๐๐ข๐๐ง: Applicability, screening, and Criteria 1 through 7 walked with sources and rationale. Then on criterion 8, Gordian stops and asks Dave.
"The replacement actuator uses a different torque calculation methodology. Here are both interpretations of the criterion with supporting references. Dave, you decide."
Gordian doesn't check the box. It shows Dave the evidence and gets out of the way.
Dave reads both interpretations, makes the call, documents the basis, signs the evaluation. ๐๐ก๐ซ๐๐ ๐ก๐จ๐ฎ๐ซ๐ฌ.
That judgment call is now in Gordian. When a similar mod comes up when Dave isn't around, another engineer can see exactly how Dave reasoned through the ambiguity. It's not just the answer that's captured. It's the reasoning.
8 hours freed so far. That's one full Dave-day at a normal job. Dave has never had a normal job.
Dave left at 4. ๐๐'๐ฌ ๐ ๐จ๐ข๐ง๐ ๐ญ๐จ ๐๐ฎ๐ข๐ฅ๐ ๐ ๐๐ข๐ซ๐ ๐จ๐ฎ๐ญ ๐๐๐๐ค ๐ญ๐จ๐ง๐ข๐ ๐ก๐ญ.


Related Posts

Your Plant Already Has a Knowledge Graph. It's a Guy Named Dave.
Knowledge graphs make engineering visible. And in a capital-intensive, schedule-sensitive regulated industry, that is worth a LOT.

"Free Dave" Day 1: Surveillance Traceability
Dave answers Lena's surveillance-frequency question faster than ever and gets home in time to grill. #freedave